1. Factory Footprint: 30,000 sq m Under One Roof
Activate Games indoor amusement equipment China headquarters occupies 30,000 sq m in Shenzhen’s high-tech corridor. Vertical integration includes:
- CNC machining hall – 5-axis routers, 2 µm repeatability
- SMT line – 80,000 components/hour, 01005 chip package
- Burn-in chamber – 48 h at 60 °C/80 % RH, 1,000 m³ volume
- Aging room – −10 °C to +60 °C cyclic test for 72 h
Monthly capacity: 180 VR arenas, 250 motion walls, 1,200 floor tiles.
2. 12-Stage QC Workflow (0-defect target)
Stage | Test | Duration | Pass Gate |
---|---|---|---|
1 | Steel spectroscopy | 30 min | > 98 % Al 6061 |
2 | Weld X-ray | 45 min | zero porosity > 1 mm |
3 | PCB ICT | 90 min | 100 % placement |
4 | Sensor calibration | 6 h | 0.3 mm accuracy |
5 | 48 h burn-in | 48 h | zero drift |
6 | Vibration table | 90 min | 5–100 Hz, 2 G |
7 | Drop test | 30 min | 1.2 m corner, no damage |
8 | Documentation audit | 60 min | CE, FCC, ROHS, ISO 9001 |
9 | Vacuum seal | 15 min | RH < 40 % |
Recorded first-pass yield: 98.7 %; 0.3 % field failure across 1,200 shipped arenas. |
3. Certifications – Global Passport
- CE (EU) – EN 55032, EN 55035, EN 62368
- FCC (US) – Part 15 Class A
- ROHS – 10 restricted substances < 0.1 %
- ISO 9001:2015 – annual SGS audit
- ISPM-15 – heat-treated pine crates, no methyl bromide
Certificates ship inside every crate; Activate Games QR code links to original PDF.
4. Lead Time & Logistics
- Production: 18 days after 30 % deposit
- Sea freight L.A.: 14 days DDP
- Rotterdam: 22 days DDP
- 40-ft HQ load: 12 complete 4-station arenas
- Freight saving: 9 % vs LCL
Air freight option: 6 days, $9,200 per arena door-to-door.
5. White-Label & Customization
- Silk-screen logo – MOQ 20 units, no extra cost
- Custom RAL powder coat – 3-day lead time
- Boot-up splash – 24-hour turnaround
- Language pack – 40 languages, user-uploadable CSV
6. Financial Snapshot – landed cost per 4-station VR arena Activate Games
Item | USD |
---|---|
EXW hardware | $52,800 |
Sea freight DDP LA | $2,100 |
Import duty 6 % | $3,288 |
Landed | $58,188 |
ROI case: Ohio site gross $620 k yr-1, payback 9.8 months. |
7. Sustainability & CSR
- 30 % factory solar – 1.2 GWh/year
- Lead-free solder, mercury-free LEDs
- Aluminum off-cut recycled into brackets
- Local hiring – 65 % workforce from Guangdong rural program
8. Technology Roadmap 2025-2026
- Inside-out tracking – no ceiling bars (beta Q2 2025)
- AI skin generator – branded theme in 15 min
- 5G edge gateway – sub-10 ms cloud ping
9. Global Support Network
- Spare-parts hubs: Los Angeles, Rotterdam, Dubai
- 24/7 English hotline – < 30 s pickup
- OTA firmware – delta update < 200 MB
10. Call to Action – Lock 18-Day Lead Time Before Q2 Rush
- Download 45-page export certification pack (PDF)
- Book virtual factory walkthrough (Zoom, English/Spanish)
- Secure $1,000 freight credit on first container before global component shortage

Comments are closed.